GDP 2014‎ > ‎Groups and Projects‎ > ‎Group 04‎ > ‎

Week 2

posted 3 Jun 2014, 07:48 by Group Design Projects Imperial
After receiving the brief and meeting with our supervisor we are progressing well with our project. We are set on producing a superb new Thames crossing for east London and have conducted much research into the geology and transport of the area to get us started.


The more artistic amongst our team have been providing some fantastic designs whilst others have been developing an extensive 3D ground model of the area!
The post-it notes came at just the right time to motivate the workforce and having narrowed down the nature of our crossing to two options we hope to soon reach a defining stage within the project. But until then it’s:  ‘'Bridge vs Tunnel’’


Peace out, Thames Crossing LTD
Comments