Group 04

Week 3

posted 10 Jun 2014, 09:44 by Group Design Projects Imperial

It’s been a long week here at Thames Crossing LTD. We have been combining a lot of online demographic and traffic data with the understanding and information we’ve received from site visits.


After much debate we are leaning towards a tunnel, but then this is engineering and anything can change in a week. We also rearranged the seating in the office this week to switch things up and increase productivity!!

Week 2

posted 3 Jun 2014, 07:48 by Group Design Projects Imperial

After receiving the brief and meeting with our supervisor we are progressing well with our project. We are set on producing a superb new Thames crossing for east London and have conducted much research into the geology and transport of the area to get us started.


The more artistic amongst our team have been providing some fantastic designs whilst others have been developing an extensive 3D ground model of the area!
The post-it notes came at just the right time to motivate the workforce and having narrowed down the nature of our crossing to two options we hope to soon reach a defining stage within the project. But until then it’s:  ‘'Bridge vs Tunnel’’


Peace out, Thames Crossing LTD